LEWP-RCEG Dublin April 2013

Hans Borgonjen

Platforms / Agenda • LEWP - RCEG (Law Enforcement Working Party – Radio Communication Expert Group) - Forerunner Group ‘LEWP Matrix’ + ‘3-scenario document’

• CEPT-PT49 Frequency allocation studies • European Commission - RSPP text

• TCCA - CCBG (Tetra & Critical Communication Association) (Critical Communication Broadband Group) - CCBG user+operator requirement group: ‘umbrella document’ - ‘Time line’ (Roadmap) - ‘Strategic Case’ (Business Case)

LEWP user requirement matrix high speed data • Known as the “LEWP Matrix”

• Use it for your internal discussions • Basis for CEPT PT49 • Basis for ETSI for technology discussion - ETSI adds detailed figures - CEPT PT49 uses this ETSI figures - Now also ‘ETSI frequency calculation tool’ (LEWP-ETSI Matrix)

PublicSafety highspeed user requirements Type of application + services

throughput p/s per session

use per month per user

Number of users

mobility (using while moving)

quality of experience (can there be a hiccup in the connection)

Availability/ start-up time

timeliness

continuous operational availability (mission critical level)

A(V)LS data to CCC

low

high

high

high

medium

ready

high

high

A(V)LS data return

medium

high

medium

high

medium

ready

high

high

Video from/to CCC for following + intervention

high

low

medium

high

low

ready when vehicle is ready

medium

high

Video for fixed observation

medium (high on hdd)

high

low

low

low

low

medium

medium

Video on location (disaster or event area)

high

low

low

low

medium

Take along on ad hoc basis

medium

high; availability at Golden Hour essential

Video conferencing operations

medium

low

low

low

low

low

medium

low

LOCATION DATA

MULTI MEDIA

Type of application + services

throughput p/s per session

use per month per user

Number of users

mobility (using while moving)

quality of experience (can there be a hiccup in the connection)

Availability/ start-up time

timeliness

continuous operational availability (mission critical level)

Photo broadcast

medium

low

medium

high

low

ready

low

medium

Photo to select group

medium

low

low

high

low

ready

low

medium

PDA PIMsync

medium

high

low

high

low

ready

low

low

Mobile workspace + (incl public internet)

medium

medium

low

high

low

ready

low

low

medium

low

medium

low

high

ready

medium

high

OFFICE APPLICATIONS

DOWNLOAD OPERATIONAL INFORMATION Incident information download (text + images) from CCC to fieldunits + Netcentric working

LEWP-RCEG meeting 24 october Letter LEWP to ECC, CEPT-FM, PT49

-

Many references to earlier documents Stating the importance of PT49 Offer to continue to cooperate Stating the earlier LEWP inputs (Matrix + 3-scenario document)

RSPP Radio Spectrum Policy Program RSPP Art. 8(3), Quote

CCBG • There is a TCCA-CCBG Roadmap See presentation Emmanuelle • There is an “umbrella document” with all user requirements + system requirements Based on all kind of existing URS’s • There is a discussion on architecture: what in the LTE core + what in an “upper application layer”

Presentation on behalf of the TETRA + Critical Communications Association

Event Calendar 1.

PT49: 25+26 April Paris 13+14 June Oslo

2.

TCCA-CCBG CCBG 17 April Budapest TCCA-CCW 21-23 May Paris (World Congress) With posibility for joining President of Interpol + EC CCBG 27 June Amsterdam CCBG 8 Oct. London

3.

EC General frequency conference 25+26 June Brussels EC PPDR workshop 11 July Brussels

4.

Severals LTE summit 25-26 June Amsterdam IIR + CCBG ‘professional LTE + spectrum Forum’ 9-11 Oct. London IIR Controlroom 10-12 Dec. Vienna

CEPT-FM PT49 • PT49: special working group for PPDR mobile broadband

• Participation of Public Safety is essential • PT49 wants close relationship with LEWP • LEWP Matrix is basis for frequency demand discussion in PT49

• ‘Report A’ with LEWP Matrix + German study as basis • Extra explanation by ‘3 Operational Scenario’s’ document + Get in contact with you national administration

Roadmap of the FM49 work

• FM49 main task: find harmonised radio spectrum for the future European broadband PPDR system

• The concept of the future European broadband PPDR system: Wide Area Network (WAN) + Ad-Hoc networks • ECC Report ”A” (requirements) – 2012 ECC Report ”B” (solutions) – 2013 • FM49 also supports the CEPT/ECC preparatory work for the World Radio Conference 2015 (WRC-15) Agenda Item 1.3 on the spectrum requirements for PPDR

FM49#04 meeting (14-15 June, Berlin) (1)

• The “Catalogue of PPDR Applications Related Requirements” was approved by FM49 and created a basis for the work on the ECC Report “A” (requirements) • The work on the assessment of the necessary overall spectrum bandwidth for a BB PPDR Wide Area Network (WAN) was started based on the following assumptions: o applications: LEWP/RCEG-ETSI “Matrix of applications” o scenarios: LEWP/RCEG PP1 and PP2 scenarios o technology: LTE o frequency ranges: 400 MHz and 700 MHz (other candidate frequency bands are also under discussion)

Result PT49 ECC report A In report A the ‘requirements’ en in report B the ‘solutions’. In report A: • General description PPDR ‘operational framework’, • Concept future PPDR BB (WAN + ad-hoc networks), • PPDR Application related requirements (LEWP/RCEG-ETSI Matrix + scenarios), • Operational requirements for WAN (‘terrestrial fixed network’), • Spectrum demands for WAN (from correspondence Group + ETSI calculation tool) • Chapters on ‘non-WAN’ services: DMO, AGA, Ad-hoc networks • Chapter on voice (consequences if in future voice goes over the LTE network) + annex from ETSI with calculation on spectrum consequences of it • Rapport A also contains definition of terminologies

Report A For the WAN there are several calculations made (uplink, downlink, optimistic + pessimistic link-budget, users at edge of a cell etc.) • Overall result is (minimum) 2x 10 MHz needed as harmonised ‘core band’, with the possibility to have more (or less) on a national basis. • This is without AGA, DMO, ‘voice over LTE’, extra capacity for ad-hoc networks. • ETSI calculation for ‘voice over LTE’ gives an estimation that an other 2x3,2 MHz is needed (based on comparable functionality with Tetra). • Hybrid solution is mentioned as a good mix between partly dedicated and partly using commercial operator. In Report A is this flexibility clearly indicated.

View more...