Riviera Stations regeneration

January 9, 2018 | Author: Anonymous | Category: Social Science, Political Science, Media
Share Embed Donate


Short Description

Download Riviera Stations regeneration...

Description

Simon Gyde Route Asset Manager, Buildings Simon Gyde Date 00.00.00 1

Riviera stations regeneration Section number to go here

Riviera Stations regeneration Major renewals and refurbishment planned at:

• Torquay • Torre • Paignton Works programmed late 2013 – April 2014. Network Rail funded works c.£2.8m

Date 00.00.00

Create your footer by changing copy in the Header and Footer section

3

Torquay station • Phase 1 - Agreed package of reactive repairs completed 2012. AFC £50k. • Phase 2 - Road bridge at country end of the station to be refurbished. AFC £400k. On site 20 May 2013 for 18 weeks. • Phase 3 - Station footbridge and canopies to be refurbished late 2013 – April 2014. AFC £1.15m.

Date 00.00.00

Create your footer by changing copy in the Header and Footer section

4

Torre station

• Phase 1 -Refurbishment of listed footbridge completed 2012. Total AFC: £350k • Phase 2 – platform canopy to be refurbished late 2013 – completion by April 2014. Total AFC : £150k

Date 00.00.00

Presentation title to go here

5

Paignton station • Ticket office roof repairs complete Spring 2013. • Station footbridge and canopies to be refurbished late 2013. AFC: £1.13m • Works to be completed by April 2014. • New colour scheme proposed to match that of Torquay and Torre.

Date 00.00.00

Presentation title to go here

6

In summary.. • Major refurbishment proposals at Torquay, Teignmouth and Torre aim to restore the listed buildings and structures to former glory. • ‘Riviera line’ colours scheme to be adopted at each location. • All proposals will be fully integrated with other Non – Network Rail work items and funding streams. • Work programmes to be shared with stakeholders. • Total expenditure 2013 /14 = c.£2.8m • Plus… similar packages of work proposed in 13/14 at Dawlish and Teignmouth stations.

Date 00.00.00

Create your footer by changing copy in the Header and Footer section

7

Riviera station regeneration

•Questions?

Date 00.00.00