E-Rate K12 Network Update

January 9, 2018 | Author: Anonymous | Category: Arts & Humanities, Writing, Spelling
Share Embed Donate


Short Description

Download E-Rate K12 Network Update...

Description

E-Rate K12 Network Update

Dr. John D. Barge, State School Superintendent “Making Education Work for All Georgians” www.gadoe.org

E-Rate K12 Network Update • New contract awarded to AT&T • Contract to supply 15Mbps per school • Contract term is 1 year with 1 year option (if needed) • Planned move to PeachNet® July 1, 2015

Dr. John D. Barge, State School Superintendent “Making Education Work for All Georgians” www.gadoe.org

AT&T Upgrade from 3Mbps to 15Mbps • Circuits: DS3, New Ethernet and Existing Ethernet upgrades • Survey must be completed http://apps.gadoe.org/districts/iucontacts.nsf • Information used to place orders and install • Communications will be directed by groupings for specific circuit activities outside of direct communications Dr. John D. Barge, State School Superintendent “Making Education Work for All Georgians” www.gadoe.org

AT&T Upgrade LCON: What to expect • Site visit(s): Must be scheduled ASAP, Site Ready - a list of items to be completed in order to be “Site Ready” will be provided by the Engineer. • Router: New Routers or Reconfiguration will depend on our current circuit and bandwidth. If new, they will be shipped to your attention. Dr. John D. Barge, State School Superintendent “Making Education Work for All Georgians” www.gadoe.org

AT&T Upgrade LCON: What to expect • Access Circuit Delivery: You must be available for engineer access to facilities. Please mark your new circuit. • Test and Turn-up: You will schedule when you are available to assist with testing. Circuit outages will vary from 15min to 1hr.

Dr. John D. Barge, State School Superintendent “Making Education Work for All Georgians” www.gadoe.org

PeachNet®

View more...

Comments

Copyright � 2017 NANOPDF Inc.
SUPPORT NANOPDF